UPDATE – Main Pool Closed, anticipate a normal opening at 1100 tomorrow

Good evening to all.

The main pool pump motor has arrived onsite but we experienced electrical input challenges.

Our electrician will be out in the morning to fix the input issue.

We expect the main pool to be operational for the normal 1100 opening tomorrow, Tuesday, July 9th.

Thank you for your patience while we fixed this challenge to our normal operating environment.

Regards,

Mark

Asphalt Crack-fill; Specific Space, Yellow Curb, and White Curb Painting and Marking – TOMORROW, 5 JULY 2024 

All – our contractor was held up on another job on 3 July 2024.  They will be in the community tomorrow (5 July 2024) to accomplish what aspects of the project they can and return sometime next week to finish the project.

For those with assigned spaces to be renumbered; if you are able to leave your space open tomorrow then they will try to get you accomplished during the day.  For those who cannot support this request, we will send another letter and update the signs once we have a date and time to complete the project.

The white curbs are marked as No Parking areas for tomorrow.  If possible we’d like to get all the white and yellow curbs accomplished tomorrow along with as many spaces as we can to minimize the time needed next week to complete the project.

Thanks for your flexibility supporting this aspect of the overall project.

I’ll send out a full message once I have clarity on the way forward with the railings for the overall project.

Enjoy the July 4th evening!

Regards,

Mark

PWCA Information for Members and Residents (June 2024, Message #3) 

Good morning – several updated items for your review.

PERMANENT LINKS:

PWCA Website: https://parkwestcommunity.org/
PWCA Meeting Packets: https://parkwestcommunity.org/association-meeting/
ACC Documents: https://parkwestcommunity.org/architectural-control-committee/
Parking Documents: https://parkwestcommunity.org/parking/
Newsletters: https://parkwestcommunity.org/newsletters/
Quarterly Assessment Timeline: https://parkwestcommunity.org/living-in-pwca/
Trash and Recycling Information: https://parkwestcommunity.org/our-environment/

SEASONAL LINKS:

Director Application for Candidacy: https://parkwestcommunity.org/board-of-directors-chairs-and-managers/
2024 J&J Individual Home Maintenance Program: https://parkwestcommunity.org/our-environment/
2024 Pool Application, Rules, Sign-in Instructions, Group Reservation Form: https://parkwestcommunity.org/pool/

INFORMATION ITEMS:

1.  2024 POOL PASS DISTRIBUTION.  Remaining distribution of pool passes will be handled on an individual basis with the Pool Committee.  Please email, call, or text the Pool Committee Chair to make arrangements.  

2.  CURRENT POOL ENTRY PROCEDURES.  We are operating using the SignUpGenius systems with your pool passes.  We have had an instance or two of upset individuals who want to enter the pool without a pass.  Please treat our guards with respect – they are just following our prescribed process.  If you have concerns with our process please speak with the Pool Committee – not the guards.

3.  FUTURE POOL ENTRY PROCEDURES.  We are planning to move to a different sign-in system during the season.  This system will provide you the capability to sign-in and sign-out via your phone and should be much more efficient than our current process.  We still plan to have the new system active before July 4th for all pool pass holders.  We will need you to reapply once the system goes active – the approval process will be completely electronic with the new system.  An option will be available for a physical pass at a minor cost if needed. We believe this will be a positive step for all of us to enjoy our pool.

4.  POOL OPERATING HOURS; 2024 REGULAR SEASON HOURS.  Our hours are as normal for this season.

  • Regular Summer Hours (from June 13, 2024 to Labor Day)
    • Monday, Tuesday, Wednesday, Friday, Sunday: 11:00AM – 8:00PM
    • Thursday, Saturday: 11:00AM – 9:00PM
    • Exception – for any Holiday, the pool will open at 10:00AM  (i.e. Thursday, July 4, 2024 and Monday, September 2, 2024)

5.  RETAINING WALL REPLACEMENT AND FOOTPATH REPLACEMENT; ONGOING.  The formwork for the retaining wall is planned for removal today with sidewalk concrete in the next few days.  The upper Carriagepark Road will be accomplished in conjunction with the sidewalk actions.  Once the sidewalk has cured we will accomplish the remediation of the landscape impacted by the work.  The railing solution is still being sorted out – I anticipate there will be some temporary fencing installed in the interim.  Please refrain from traveling on the footpath and walking across private ground until the footpath is open.  Once the footpath is open and until the permanent railing solution is in-place please exercise additional care if you walk down the footpath.

6.  ASPHALT CRACK-FILL, SPECIFIC PARKING SPACE SIGNAGE, AND YELLOW AND WHITE CURB PAINTING AND MARKING; TUESDAY, JULY 2, 2024 AND WEDNESDAY, JULY 3, 2024.  We will be accomplishing crack-fill of the asphalt in the drive lanes and in parking spaces where available and painting some parking spaces whose numbers have worn off or the incorrect numbers applied to the space.  We will also repaint the yellow and white curbs during this project.  Curb spaces and parking spaces will be impacted by this work.  The three white-painted curbs will be marked this weekend.  Vehicles will be relocated or towed at the owners expense if they are in the no parking zones during the project timeframe. 

7.  PARKING SPACE NUMBERING.  A list of 23 spaces to be repainted has been provided to the contractor.  The specific residences and parking spaces impacted will be notified this weekend.  Vehicles will be relocated or towed at the owners expense if they are in any of the identified assigned space no parking zones during the project timeframe.

8.  JULY 4TH SOCIAL EVENT; THURSDAY, JULY 4, 2024; SETUP – 10:30AM; EVENT 12:00PM (NOON); POOL.  Our largest event of the season is ONE WEEK away!  We will be accomplishing this event in the same manner as last year – a catered meal from Red Hot & Blue.  There is no rain date planned for this event – should adverse weather cancel the event we will request you to come down to the pool house with some storage containers to grab food so the meal doesn’t go to waste.  This event needs several volunteers to accomplish the variety of support tasks needed to make a successful event – email Diane Barnhard at Social@ParkWestCommunity.org for further information.

9.  BOARD OF DIRECTORS MEETING; TUESDAY; JULY 16, 2024; 7:00 PM; VIRTUAL.  The monthly board meeting will be conducted via the RingCentral virtual meeting framework. For the virtual meeting information, see the link listed above in the Permanent Links section.  Scroll down the the Meeting Materials and Minutes section, select the year (2024), then the meeting (20240716). Document #01-1 contains the information to join the meeting.

10.  WATERING SUPPORT REQUEST CARRIAGEPARK COURT AND CARRIAGEPARK ROAD NEAR THE NEWLY PLANTED SOUTHERN MAGNOLIAS AND PIPELINE LANDSCAPE BED.  We have sourced watering support for the pipeline project and are in progress of making them operational.  Thanks to those who stepped forward to help on this and our other watering support projects ongoing during this season! 

11.  INDIVIDUAL GROUNDS CARE OFFER FROM J&J LANDSCAPE MANAGEMENT, APPLY AS SOON AS POSSIBLE.  Our grounds care contractor is again offering residences in our community the ability to have your private yards maintained.  The care options include turf care, lawn care, and leaf removal.  Please refer to the link listed above in the Seasonal Links section, just scroll down the page to the applicable information, or contact myself if you cannot access the information.

12.  GROUNDS CARE REMINDERS.  As a reminder, please keep the following items in mind during the growing season. #1 – keep your vehicle bumpers off the curb during mowing days as the crew cannot mow, edge or trim (as appropriate) when your vehicle is parked on top of the turf. #2 – For those of you who have landscaped up to the sidewalk – you are responsible to keep the sidewalk edge nearest your residence clean if the edger cannot be operated safely. #3 – Keep all items stored inside your fence / or your property for those without rear fences. See the ACC and ECC Rules for additional information.

13.  OWNER ACCOUNT PORTAL.  This is a recurring topic for many of our owners.  Each owner has the ability to access their account through a portal Summit Management offers.  To access the portal, please go to our website and select the ‘Living in PWCA’ tab.  Scroll down the page to the button ‘Vantaca Owner Login’.  If you have not already done so, Vantaca will prompt you to create a login.  Once you login you’ll be able to access your owner information to include the status of your account.  This also provides an avenue to pay any balances due on the account.

14.  OPEN DIRECTOR POSITIONS.  Request your consideration to place your name forward to fill our open Director positions.  We are looking for people who are invested in making a better community for all who reside here.  If you are interested please complete and submit an Application for Candidacy that may be found on our website and is listed above in the links.  The Nominating Committee will reach out to you after you complete that step.  If you have questions I’m also available to speak with you about more specifics.

Hope you enjoy the pool during this heat wave we are in the middle of.  Please remember not to walk on the impacted concrete project areas.  Stay cool!

Regards,

Mark

PWCA Information for Members and Residents (June 2024, Message #2) 

Good morning – several items for your review.

PERMANENT LINKS:

PWCA Website: https://parkwestcommunity.org/
PWCA Meeting Packets: https://parkwestcommunity.org/association-meeting/
ACC Documents: https://parkwestcommunity.org/architectural-control-committee/
Parking Documents: https://parkwestcommunity.org/parking/
Newsletters: https://parkwestcommunity.org/newsletters/
Quarterly Assessment Timeline: https://parkwestcommunity.org/living-in-pwca/
Trash and Recycling Information: https://parkwestcommunity.org/our-environment/

SEASONAL LINKS:

Director Application for Candidacy: https://parkwestcommunity.org/board-of-directors-chairs-and-managers/
2024 J&J Individual Home Maintenance Program: https://parkwestcommunity.org/our-environment/
2024 Pool Application, Rules, Sign-in Instructions, Group Reservation Form: https://parkwestcommunity.org/pool/
2024 EagleBank Graduation Schedule: https://parkwestcommunity.org/living-in-pwca/

INFORMATION ITEMS:

1.  2024 POOL PASS DISTRIBUTION.  Remaining distribution of pool passes will be handled on an individual basis with the Pool Committee.  Please email, call, or text the Pool Committee Chair to make arrangements.  

2.  CURRENT POOL ENTRY PROCEDURES.  We are operating using the SignUpGenius systems with your pool passes.  We have had an instance or two of upset individuals who want to enter the pool without a pass.  Please treat our guards with respect – they are just following our prescribed process.  If you have concerns with our process please speak with the Pool Committee – not the guards.

3.  FUTURE POOL ENTRY PROCEDURES.  We are planning to move to a different sign-in system during the season.  This system will provide you the capability to sign-in and sign-out via your phone and should be much more efficient than our current process.  We still plan to have the new system active before July 4th for all pool pass holders.  We will need you to reapply once the system goes active – the approval process will be completely electronic with the new system.  An option will be available for a physical pass at a minor cost if needed. We believe this will be a positive step for all of us to enjoy our pool.

4.  POOL OPERATING HOURS; 2024 REGULAR SEASON HOURS.  Our hours are as normal for this season.

  • Regular Summer Hours (from June 13, 2024 to Labor Day)
    • Monday, Tuesday, Wednesday, Friday, Sunday: 11:00AM – 8:00PM
    • Thursday, Saturday: 11:00AM – 9:00PM
    • Exception – for any Holiday, the pool will open at 10:00AM  (i.e. Thursday, July 4, 2024 and Monday, September 2, 2024)

5.  RETAINING WALL REPLACEMENT AND FOOTPATH REPLACEMENT; STARTS TOMORROW, 20 JUNE 2024.  The project begins tomorrow!  Please refrain from traveling on the footpath until completion of the project.  Our last remaining wood retaining wall, located at the main storm water basin to the rear of 4827 Carriagepark Road, has been failing for several years and is in imminent need of replacement before a physical failure occurs.  The project will replace the retaining wall with a concrete wall while also replacing a section of the existing asphalt footpath with a concrete sidewalk.  The existing railings will be modified as needed and reused.  This project will take around two weeks and the footpath will be closed to traffic during the project.  Please adhere to all signs and directions provided during the duration of the project.  Curb spaces and assigned spaces have been marked.  Towing or relocation will occur at the residence’s expense during the duration of the project.

6.  ASPHALT CRACK-FILL, SPECIFIC PARKING SPACE SIGNAGE, AND YELLOW AND WHITE CURB MARKING; JUNE 2024.  We will be accomplishing crack-fill of the asphalt in the drive lanes and in parking spaces where available and painting some parking spaces whose numbers have worn off or the incorrect numbers applied to the space.  We will also repaint the yellow and white curbs during this project.  Some curb spaces and parking spaces will be impacted by this work.  The specific residences and parking spaces impacted will be notified of the specifics as we near the timeframe to accomplish the work.  The crack-fill and painting project is anticipated to be less than two days of impact to you.

7.  PARKING SPACE NUMBERING.  A list of 23 spaces to be repainted has been provided to the contractor.

8.  JULY 4TH SOCIAL EVENT; THURSDAY, JULY 4, 2024; SETUP – 10:30AM; EVENT 12:00PM (noon); POOL.  Our largest event of the season is TWO WEEKS away!  We will be accomplishing this event in the same manner as last year – a catered meal from Red Hot & Blue.  There is no rain date planned for this event – should adverse weather cancel the event we will request you to come down to the pool house with some storage containers to grab food so the meal doesn’t go to waste.  This event needs several volunteers to accomplish the variety of support tasks needed to make a successful event – email Diane Barnhard at Social@ParkWestCommunity.org for further information.

9.  BOARD OF DIRECTORS MEETING; TUESDAY; JULY 16, 2024; 7:00 PM; VIRTUAL.  The monthly board meeting will be conducted via the RingCentral virtual meeting framework. For the virtual meeting information, see the link listed above in the Permanent Links section.  Scroll down the the Meeting Materials and Minutes section, select the year (2024), then the meeting (20240716). Document #01-1 contains the information to join the meeting.

10.  WATERING SUPPORT REQUEST CARRIAGEPARK COURT AND CARRIAGEPARK ROAD NEAR THE NEWLY PLANTED SOUTHERN MAGNOLIAS AND PIPELINE LANDSCAPE BED.  Please consider this request as professional watering support is quite expensive to the Association.  We did this project with volunteer support sourced to water the new plantings but that support is not able to continue as planned.  If you are fairly close to the planting area I request your consideration to use your hose bib for an automatic watering system.  We will reimburse for all water consumed by the system during the season.  This system would work as the system functioning from 4800 Carriagepark Road is currently operating. 

11.  INDIVIDUAL GROUNDS CARE OFFER FROM J&J LANDSCAPE MANAGEMENT, APPLY AS SOON AS POSSIBLE.  Our grounds care contractor is again offering residences in our community the ability to have your private yards maintained.  The care options include turf care, lawn care, and leaf removal.  Please refer to the link listed above in the Seasonal Links section, just scroll down the page to the applicable information, or contact myself if you cannot access the information.

12.  GROUNDS CARE REMINDERS.  As a reminder, please keep the following items in mind during the growing season. #1 – keep your vehicle bumpers off the curb during mowing days as the crew cannot mow, edge or trim (as appropriate) when your vehicle is parked on top of the turf. #2 – For those of you who have landscaped up to the sidewalk – you are responsible to keep the sidewalk edge nearest your residence clean if the edger cannot be operated safely. #3 – Keep all items stored inside your fence / or your property for those without rear fences. See the ACC and ECC Rules for additional information.

13.  OWNER ACCOUNT PORTAL.  This is a recurring topic for many of our owners.  Each owner has the ability to access their account through a portal Summit Management offers.  To access the portal, please go to our website and select the ‘Living in PWCA’ tab.  Scroll down the page to the button ‘Vantaca Owner Login’.  If you have not already done so, Vantaca will prompt you to create a login.  Once you login you’ll be able to access your owner information to include the status of your account.  This also provides an avenue to pay any balances due on the account.

14.  OPEN DIRECTOR POSITIONS.  Request your consideration to place your name forward to fill our open Director positions.  We are looking for people who are invested in making a better community for all who reside here.  If you are interested please complete and submit an Application for Candidacy that may be found on our website and is listed above in the links.  The Nominating Committee will reach out to you after you complete that step.  If you have questions I’m also available to speak with you about more specifics.

Hope you enjoy the pool during this heat wave we are in the middle of.  Please remember not to walk on the impacted concrete project areas.  Stay cool!

Regards,

Mark

PWCA Information for Members and Residents (June 2024, Message #1)

Good evening – several items for your review.

PERMANENT LINKS:

PWCA Website: https://parkwestcommunity.org/
PWCA Meeting Packets: https://parkwestcommunity.org/association-meeting/
ACC Documents: https://parkwestcommunity.org/architectural-control-committee/
Parking Documents: https://parkwestcommunity.org/parking/
Newsletters: https://parkwestcommunity.org/newsletters/
Quarterly Assessment Timeline: https://parkwestcommunity.org/living-in-pwca/
Trash and Recycling Information: https://parkwestcommunity.org/our-environment/

SEASONAL LINKS:

Director Application for Candidacy: https://parkwestcommunity.org/board-of-directors-chairs-and-managers/
2024 J&J Individual Home Maintenance Program: https://parkwestcommunity.org/our-environment/
2024 Pool Application, Rules, Sign-in Instructions, Group Reservation Form: https://parkwestcommunity.org/pool/
2024 EagleBank Graduation Schedule: https://parkwestcommunity.org/living-in-pwca/

INFORMATION ITEMS:

1.  2024 POOL PASS DISTRIBUTION; WEDNESDAY; JUNE 5, 2024; 6:00PM – 6:30PM; POOL.  The first distribution window will occur on Wednesday; May 29, 2024; from 6:00 PM to 6:30 PM.  Additional times may be announced – check the pool message board for dates and times or contact the Pool Committee to arrange alternate arrangements.  

2.  ROAD RAIDERS COMMUNITY CLEANUP; SATURDAY; JUNE 8, 2024; 9:00 AM.  From Road Raiders:  The next Road Raiders event will be Saturday, June 8th, from 9 a.m.-11 a.m. at Monticello Park. We’d love see see a lot of you out there to help clean one of our favorite neighborhood parks!

3.  CURRENT POOL ENTRY PROCEDURES.  We are operating using the SignUpGenius systems with your pool passes.  We have had an instance or two of upset individuals who want to enter the pool without a pass.  Please treat our guards with respect – they are just following our prescribed process.  If you have concerns with our process please speak with the Pool Committee – not the guards.

4.  FUTURE POOL ENTRY PROCEDURES.  We are planning to move to a different sign-in system during the season.  This system will provide you the capability to sign-in and sign-out via your phone and should be much more efficient than our current process.  We still plan to have the new system active before July 4th for all pool pass holders.  We will need you to reapply once the system goes active – the approval process will be completely electronic with the new system.  An option will be available for a physical pass at a minor cost if needed. We believe this will be a positive step for all of us to enjoy our pool.

5.  POOL OPERATING HOURS; 2024 REGULAR SEASON HOURS.  Our hours are as normal for this season.

  • Opening Day – End of Fairfax County Public School Year (June 12, 2024)
    • Monday, Tuesday, Wednesday, Friday: 1:00PM – 8:00PM
    • Thursday: 1:00PM – 9:00PM
    • Saturday: 11:00AM – 9:00PM
    • Sunday: 11:00AM – 8:00PM
    • Exception – for any Holiday, the pool will open at 10:00AM (i.e. Monday, May 27, 2024)
  • Regular Summer Hours (from June 13, 2024 to Labor Day)
    • Monday, Tuesday, Wednesday, Friday, Sunday: 11:00AM – 8:00PM
    • Thursday, Saturday: 11:00AM – 9:00PM
    • Exception – for any Holiday, the pool will open at 10:00AM  (i.e. Thursday, July 4, 2024 and Monday, September 2, 2024)

6.  GRADUATION EVENTS AT EAGLEBANK ARENA, THROUGH JUNE 18, 2024.  Graduation season is here and we are seeing increased traffic impacts on our roads.  Please see our website for the list of the 45 graduations planned.  Anticipate major traffic delays before and after each event so plan accordingly when you travel from/to our community.

7.  BOARD OF DIRECTORS MEETING; TUESDAY; JUNE 18, 2024; 7:00 PM; VIRTUAL.  The monthly board meeting will be conducted via the RingCentral virtual meeting framework. For the virtual meeting information, see the link listed above in the Permanent Links section.  Scroll down the the Meeting Materials and Minutes section, select the year (2024), then the meeting (20240618). Document #01-1 contains the information to join the meeting.

8.  RETAINING WALL REPLACEMENT AND FOOTPATH REPLACEMENT; START 20 JUNE 2024.  We have a definite start date for the replacement of our last wood retaining wall.  This wall, located at the main storm water basin to the rear of 4827 Carriagepark Road, has been failing for several years and is in imminent need of replacement before a physical failure occurs.  The project will replace the retaining wall with a concrete wall while also replacing a section of the existing asphalt footpath with a concrete sidewalk.  The existing railings will be modified as needed and reused.  This project will take around two weeks and the footpath will be closed to traffic during the project.  Please adhere to all signs and directions provided during the duration of the project.

9.  ASPHALT CRACK-FILL, SPECIFIC PARKING SPACE SIGNAGE, AND YELLOW AND WHITE CURB MARKING; JUNE 2024.  We will be accomplishing crack-fill of the asphalt in the drive lanes and in parking spaces where available and painting some parking spaces whose numbers have worn off or the incorrect numbers applied to the space.  We will also repaint the yellow and white curbs during this project.  Some curb spaces and parking spaces will be impacted by this work.  The specific residences and parking spaces impacted will be notified of the specifics as we near the timeframe to accomplish the work.  The crack-fill and painting project is anticipated to be less than two days of impact to you.

10.  PARKING SPACE NUMBERING REQUEST.  While we are creating a list of parking spaces to be renumbered I’d also like to request you to check your numbered spaces near your homes and email Streets@ParkWestCommunity.org if there are parking space numbers you believe need attention.  Thanks you for your consideration of this request.

11.  JULY 4TH SOCIAL EVENT; THURSDAY, JULY 4, 2024; SETUP – 10:30AM; EVENT 12:00PM (noon); POOL.  Our largest event of the season is one month away!  We will be accomplishing this event in the same manner as last year – a catered meal from Red Hot & Blue.  There is no rain date planned for this event – should adverse weather cancel the event we will request you to come down to the pool house with some storage containers to grab food so the meal doesn’t go to waste.  This event needs several volunteers to accomplish the variety of support tasks needed to make a successful event – email Diane Barnhard at Social@ParkWestCommunity.org for further information.

12.  WATERING SUPPORT REQUEST CARRIAGEPARK COURT AND CARRIAGEPARK ROAD NEAR THE NEWLY PLANTED SOUTHERN MAGNOLIAS AND PIPELINE LANDSCAPE BED.  We did this project with volunteer support sourced to water the new plantings but that support is not able to continue as planned.  If you are fairly close to the planting area I request your consideration to use your hose bib for an automatic watering system.  We will reimburse for all water consumed by the system during the season.  This system would work as the system functioning from 4800 Carriagepark Road is currently operating. 

13.  POOL OPENING DAY KICKOFF SOCIAL AND SUNDAES ON SATURDAY, REVIEW. Thank you to everyone who participated this year – the weather cooperated and at partially as a result I believe this was our best attended Opening Day social for a considerable number of years!

14.  INDIVIDUAL GROUNDS CARE OFFER FROM J&J LANDSCAPE MANAGEMENT, APPLY AS SOON AS POSSIBLE.  Our grounds care contractor is again offering residences in our community the ability to have your private yards maintained.  The care options include turf care, lawn care, and leaf removal.  Please refer to the link listed above in the Seasonal Links section, just scroll down the page to the applicable information, or contact myself if you cannot access the information.

15.  GROUNDS CARE REMINDERS.  As a reminder, please keep the following items in mind during the growing season. #1 – keep your vehicle bumpers off the curb during mowing days as the crew cannot mow, edge or trim (as appropriate) when your vehicle is parked on top of the turf. #2 – For those of you who have landscaped up to the sidewalk – you are responsible to keep the sidewalk edge nearest your residence clean if the edger cannot be operated safely. #3 – Keep all items stored inside your fence / or your property for those without rear fences. See the ACC and ECC Rules for additional information.

16.  OWNER ACCOUNT PORTAL.  This is a recurring topic for many of our owners.  Each owner has the ability to access their account through a portal Summit Management offers.  To access the portal, please go to our website and select the ‘Living in PWCA’ tab.  Scroll down the page to the button ‘Vantaca Owner Login’.  If you have not already done so, Vantaca will prompt you to create a login.  Once you login you’ll be able to access your owner information to include the status of your account.  This also provides an avenue to pay any balances due on the account.

17.  OPEN DIRECTOR POSITIONS.  Request your consideration to place your name forward to fill our open Director positions.  We are looking for people who are invested in making a better community for all who reside here.  If you are interested please complete and submit an Application for Candidacy that may be found on our website and is listed above in the links.  The Nominating Committee will reach out to you after you complete that step.  If you have questions I’m also available to speak with you about more specifics.

Hope you enjoy the rest of your week and weekend!

Regards,

Mark